«July 2017»
SunMonTueWedThuFriSat
2526272829301
23

Bay Area Reasonable Assurance Analysis Guidance Document

This Reasonable Assurance Analysis (RAA) Guidance Document describes the background, requirements, and recommended approach for conducting RAAs for programs and permittees subject to the Municipal Regional Stormwater Permit (MRP) (Order No. R2-2015-0049).). For the purposes of this Guidance Document, an RAA is a demonstration that the control measures proposed in the MRP Permittees’ Green Infrastructure Plans and Polychlorinated Biphenyls (PCBs) and Mercury Control Measure Implementation Plans (see Section 2.1.3) as required by MRP Provisions C.3, C.11, and C.12, will meet the PCBs and mercury Total Maximum Daily Load (TMDL) wasteload allocations for urban stormwater runoff.

Read more
45678
9101112131415
16171819202122
23242526272829
303112345