Presentation - Roadmap of Funding Solutions for Sustainable Streets

Bay Area Reasonable Assurance Analysis Guidance Document

  • 18 September 2018
  • Author: Geoff Brosseau
  • Number of views: 1998
  • 0 Comments

This Reasonable Assurance Analysis (RAA) Guidance Document describes the background, requirements, and recommended approach for conducting RAAs for programs and permittees subject to the Municipal Regional Stormwater Permit (MRP) (Order No. R2-2015-0049). For the purposes of this Guidance Document, an RAA is a demonstration that the control measures proposed in the MRP Permittees’ Green Infrastructure Plans and Polychlorinated Biphenyls (PCBs) and Mercury Control Measure Implementation Plans (see Section 2.1.3) as required by MRP Provisions C.3, C.11, and C.12, will meet the PCBs and mercury Total Maximum Daily Load (TMDL) wasteload allocations for urban stormwater runoff.

Interim Accounting Methodology for TMDL Loads Reduced

  • 18 September 2018
  • Author: Geoff Brosseau
  • Number of views: 243
  • 0 Comments

Evaluation of PCBs in Public Roadway and Storm Drain Infrastructure

  • 5 September 2018
  • Author: Geoff Brosseau
  • Number of views: 263
  • 0 Comments

PCBs in Priority Building Materials: Model Screening Assessment Applicant Package

Managing PCBs−Containing Building Materials during Demolition

  • 27 August 2018
  • Author: Geoff Brosseau
  • Number of views: 443
  • 0 Comments

Model Language for Municipal Adoption of Program

Managing PCBs−Containing Building Materials during Demolition

  • 27 August 2018
  • Author: Geoff Brosseau
  • Number of views: 350
  • 0 Comments
RSS
12345